top of page
Writer's pictureFlue HQ Limited

HEREFORD COLLEGE OF ARTS - ORDER RECEIVED




We are thrilled to announce that Flue HQ have received the order for Hereford College Of Arts.


Our part of the works for this project are to, design, supply and install the flue system to serve 2No. Bosch Condens 7000F condensing boilers. The product range we have selected fir this install is our MF twin wall insulated flue pipe, Our MF product gives a positive pressure resistance of up to 200Pa and a continuous high temperature capability of up to 600° at 200 pascals independently tested to BS476: Part 24 for 4 Hours.

The flue pipe for this project will be powder coated as requested by the client.


We are pleased that the flue required for this project is in stock at our warehouse, this means a faster turn around.


Flue HQ now hold a lot of stock as the delivery time for many suppliers is getting longer due to demand getting stronger. This gives us an edge with fast turn around projects and we are thrilled to be able to meet our clients required completion times.


If you have any questions about this project, any other project or you have a general enquiry then you can get in touch with one of our friendly team members who would be happy to help on: 01213 929 141 or


We are looking forward to working with a new client on this project.





9 views0 comments

Recent Posts

See All

コメント


bottom of page