Project Name: The Vaynor First School
Project Manager: Nathan Lawley
Flue HQ Limited were selected to design, supply & install the flue system at The Vaynor First School in Redditch.
The project consists of refurbishment of the existing plant room, to provide a better heating solution for the school.
Our part of the work was to design, supply, install and test the new flues at the above project. Flue HQ Limited completed the works within the timescale and within budget. We worked very closely with M&E company to ensure the project was completed swiftly and safely.
The Flue Systems installed serve 3no. Hamworthy PV110s. The product range selected for the boilers was a MF twin wall insulated prefab
ricated exhaust system suitable for wet and dry conditions. The product is capable of holding up to 5000Pa and a continuous high temperature capability of 600° at 5000Pa.
For further information on the products and services used on this project you can contact us on sales@fluehq.com or call us on 01213 929141.